Construction continues on YVR’s new Parkade and Central Utilities Building November 20, 2019.




Construction continues on YVR’s new Parkade and Central Utilities Building November 20, 2019.




Some photos from the ZZ Chrome for Kids Truck Show & Shine at Mission Raceway












Photos of snow removal equipment in action at YVR.
With the somewhat rare significant snowfall recently in the lower mainland I made my way out to YVR to capture some images of the snow removal operations at YVR.
YVR has some impressive machinery for snow removal which includes:
3 trucks capable of spreading solid and liquid materials to make sure the runways and taxiways do not freeze in cold winter conditions.
6 “Multi-Hogs” which can be equipped with a broom or a blower and or a chemical applicator.
5 Oshkosh P-Series/MB 4600 “All in One” trucks, that can each plough and sweep a 24 foot wide path on the airport runways and taxiways.
3 Oshkosh H-Series Sweepers that each have a 22 foot wide high speed broom attached.
5 Oshkosh H-Series Snow Blowers that can each launch 5,000 tons of snow 150 feet every hour. That is a combined capacity of 25,000 tons of snow being blown off runways and taxiways every hour!
3 Oshkosh P-Series Trucks that have a 24 foot wide high speed snow plough on the front end.
When a combination of this equipment is brought to bear to clear a runway or taxiway it is called an “echelon”. A full runway can be cleared in about 20 minutes.
The airport also has access to front end loaders and dump trucks to move and deposit collected snow to designated snow storage areas on the airport grounds.
Below are a few images of the various pieces of equipment in action during the recent snowfall. Click on a thumbnail to see a larger image.
Here are a few photos showing the progress being made in construction of a new six-storey parking lot and Central Utilities Building at YVR.






Photography tip: When taking photos through glass get as close as possible to the glass to reduce glare. Camera lens was almost touching window glass. Make sure flash is off. Photo of the ems truck taken through glass after sunset.


Tuesday March 28 2017 marked the first commercial flight of the Airbus A350 into YVR and Canada (by Cathay Pacific Airlines). Like any other time a new aircraft type flies into YVR or any other airport there are usually “Plane Spotters” there to see and photograph the aircraft/event. The weather Tuesday was absolutely terrible so only the diehard spotters made it out for the arrival and or departure. YVR treats the plane spotting community pretty well especially on these special occasions and Tuesday was no different. Coffee, doughnuts and some swag were provided for the spotters by YVR.
We were hoping the A350 would land on the south runway which is closest to the south side viewing platform but sadly it landed on the north runway. (Weather, air traffic and other factors play into which runway is used so while disappointing it’s no ones’ fault.) Some spotters tried to race over to the north side for the arrival but I don’t think they made it in time.
Several of us decided to stay for the departure a few hours later and luckily it worked out that it would take off on the south runway which is closest to the spotting platform.







I attended the latest YVR 2037 Master Plan open house last week. The YVR 2037 Master Plan is used for long term planning and development at the airport and the open house was another opportunity for the public to provide feedback on the future developement of YVR.
Here is some of what I learned about the updated plans.
Plane spotting location(s):
I have been interested in all thing aviation, from aircraft and plane spotting, to airport design and air traffic control for a long time. The latest YVR 2037 summary document says “plane spotting location”…singular. The diagram in the latest set of documents shows two (possible) areas…one on the south side of the north runway (26R/08L) near the east end of the runway and one by what is now known as “the dirt hill” on the north side of 26R/08L. I asked if there will be one or two plane spotting areas and is there a timeline for the construction of the plane spotting location(s)?
Nothing has been set in stone in terms of having one or two spots or in terms of construction timelines. Having said that, construction won’t happen next year but it won’t take 10 years either. I would like to see both locations become a reality but if I had to choose one it would be the location at the east end of the 26R /08L runway because it is more accessible. In talking with people from YVR I mentioned (again) to please make sure that any area or structure made for plane spotting is elevated enough so the fence is not in the way and make sure plane spotters are not looking/photographing through glass. The plane spotting area will most like be built into a larger development so how it will look is still up in the air. Hopefully when the new plane spotting area(s) are being designed, YVR asks the plane spotting community for their input on the design. Stay tuned.
Multi-use Pathway
The airport is committed to providing recreational amenities in and around the airport. There are plans to have a multi-use fully accessible pathway system around much of the island. The pathway would connect the Templeton Canada Line station to the terminal and connect the Designer Outlet to Flight Path Park along Templeton Street. There would also be a pathway along much of the east and southeast part of the island and along part of the north west part of the island. I asked if a pathway would ever go completely around the island to include the west side of the island along the foreshore at the base of 08L and 26R. LAX has access to the beach near the foot of their runways so I wondered if this was something we could see at YVR. The answer is basically no. There is not enough room between the tidal flats and the start of solid airport ground to build a pathway and it would be too costly a project.
North South Taxiway
The elevated north south taxiway is a go! There will be an elevated north south taxiway at the east end of the airport. This will provide a more direct route to the east end of the two main runways for aircraft at YVR. Construction will likely begin in 6-7 years while the planning (and preloading) will start to ramp up sooner than that. As a plane spotter and photographer I am really looking forward to seeing this project becoming a reality.
I had an interesting chat with folks at YVR about “PBN” Performance Based Navigation and also what it takes to physically accommodate a new aircraft type at the airport but will save those for another post (or two)!
For more info on YVR2037 visit: http://www.yvr2037.ca/
I took a ride on the new Evergreen Skytrain Line extension on its opening day to check things out.
First impressions are mostly good. The new line uses the same mix of cars as the other lines, including the latest Mark III cars.
The stations are bright and shiny with all the standard and upgraded signage. There are large electronic signs that show how long before the next trains will be arriving and their destination along with other information. The stations seem larger than Canada Line stations as well, with room for a train with several cars.
The only negative from the trip on the train is that there is no cell phone service in the tunnel between Burquitlam and Moody Centre. I asked Translink if cell service would be available along the entire line including in the tunnel and the answer I got back was “Not at this time, but in the future that is a possibility.” So this was and is disappointing. Hopefully they do add the ability for people to use their cell phone on the train from end to end with no gaps. Maybe Telus will step up and invest in cell service on the new line?
At Coquitlam Station they had festivities and activities to celebrate the opening of the extension…food trucks, music, a vintage bus and various activities for the kids. There was a pretty good crowd on hand despite the heavy rain.
Time will tell how well the line is used.
I had a chance to check out Greenpower Motor Company’s all electric zero emissions bus at the Canadian Urban Transit Association (CUTA) Fall Conference and Expo held at the Vancouver Convention Centre. They have been in the news in B.C recently when they provided the world’s first double decker all electric bus to the transit authority in Victoria BC.
From a passenger perspective, the fit and finish of the bus on display looks good. There are slight differences to the buses we are used with Translink buses here in the Vancouver area; the seats are a formed plastic with no covering or padding and there was no bike rack on the front of the display bus. There are two spaces for wheelchairs or scooters (or baby buggies too I suppose). There are plenty of hand rails to hold on to while standing and there are ample next stop buttons throughout the bus. The bus is also equipped with multiple (8) security cameras on board. I almost forgot to mention how quiet the bus is. While I was there they had to start up and move the bus and it was pretty much silent. In talking to one of the company representatives this was a big issue for Victoria testing out these busses for the cruise ship industry. If you have several busses waiting dockside for cruise ship passengers all running their engines and air conditioning it can be quite loud. These busses should help address the noise issue as well as the issue of emissions.
From an operators perspective the company says there could be more than $50,000 a year saved in diesel fuel costs and less money needs to be spent on electric bus maintenance.
It will be interesting to see how well all-electric buses are received not only in BC but across the country and the world.
YVR held an open house Wednesday October 12, 2016 to give the public another chance to provide feedback on the airport’s Master Plan and the airport’s future. As an avid plane spotter at YVR with an interest in all things aviation, I want to be involved with the ongoing conversations about plane spotting at YVR. So I made an effort to attend the event. For those of you who are interested you can find the complete master plan at http://www.yvr2037.ca
I was able to spend some time with a few of the YVR 2037 Master Plan project team members who were on hand to answer questions from the public; YVR CEO, Craig Richmond; Don Ehrenholz, Vice President, Engineering and Environment at YVR; Marion Town, Director of Environment at YVR; Christoph Rufenacht, Senior Engineer at YVR and Christopher Richards, Communications Specialist at YVR.
Some of the highlights of my time spent at the open house:
Speaking with CEO of YVR Craig Richmond and Marion Town, Director of Environment about the future of air travel and aircraft technology. Will there be private supersonic air travel in the future? Will there be a viable return of airships (or dirigibles) for cargo or passengers transport? Might there be a market for dirigibles that travel between North American and Europe to serve a market between fast airplane travel and slower cruise ships? We also reminisced about the fastest aircraft ever made, the SR-71 Blackbird. The SR-71 is a personal favorite of mine that I was lucky enough to see years ago at the Abbotsford Airshow. I also found out that Mr. Richmond has actually flown at or above Mach 2 (twice the speed of sound) back in his Air Force days. Pretty cool.
Speaking with Senior Engineer Christoph Rufenacht about the ongoing RESA (Runway End Safety Area) project was interesting. I learned that most RES areas at YVR will be load bearing and not the non-load bearing type. So these load bearing RESA areas can be used for taxiing aircraft but are not considered runways that aircraft plan to normally use during landing. In the future there will be a need for an additional runway at YVR so we touched on some of the things you need to consider when thinking about adding a new runway at YVR such as busiest times of day, air traffic patterns, demands on air traffic control, environmental issues along with cost and other factors. We also chatted about projects the airport may undertake in the more distant future such as an elevated taxi way on the east side of the airport. It was a really interesting discussion.
I spoke with Don Ehrenholz, Vice President, Engineering and Environment about a variety of topics including some interesting things that could be happening with luggage handling in the airport. How cool would it be to be able to track your bag in real time from the time you drop it off to the time you pick it up at your destination. This is something that the airport is looking at for the not too distant future. We also chatted about the possibility of robotic luggage handlers at airports in the distant future. Some pretty cool stuff.
I also spoke with Chris Richards in some detail about possible future plane spotting locations in and around the airport. There seems to be 3 locations being considered for an additional dedicated plane spotting platform/area. All of them look pretty good to me and provide a nice selection of places to spot (and photograph) aircraft coming and going at the airport. The airport is looking at making the “dirt pile” on the north side of the airport a proper spotting location as well as 2 possible sites on the east end of the airport between the north and south runways. No firm decisions have been made as of yet but it is exciting to think about what the future holds in terms of plane spotting at YVR.
It was a very informative open house and I look forward to seeing how YVR evolves in the future.